ESTIMATED SAVINGS
→Baseline mission cost − optimized mission cost
Calculated from the saved optimization result during mission planning.
REALIZED SAVINGS
Baseline mission cost − actual completed mission cost
Available after completion data is entered and stored.
PLANNED VS ACTUAL
Actual vs Planned captures entered actual uplift, price, fees, landing fuel, and cost alongside the immutable saved optimized plan.
WHAT THE METRICS DO NOT CLAIM
FuelOptix does not attribute every cost difference to the application. Realized Savings is not displayed below zero, and it is not shown until completion data exists.
Reporting retains estimated and realized values separately.
Dashboard and reporting views use saved optimization and completion values so a planned comparison is not confused with a post-flight outcome.